Fast Cast
Bridge®

Smarter Bridge Replacement, Built to Last

When it’s time to replace an aging or damaged bridge or culvert, the Fast Cast Bridge® is a reliable and cost-effective choice. Engineered for speed and long-term durability, it combines prefabricated steel and composite components to deliver strength and efficiency in one complete system.

Unlike traditional culverts, the Fast Cast Bridge® has no debris catchments, which allows significantly higher flow capacity and reduces the risk of damage from flooding or debris. Prefabrication in controlled conditions ensures consistent quality, while on-site installation can be completed in just days once the foundation is set.

Features and Benefits

Optional Green Frog Systems solar lighting system. 

AASHTO HL-93 rated bridge-class box culvert

Quick installation: 1-2 days for the bridge; 4-15 days total

Can be installed with force account labor (no specialized crews required)

Smaller profile with improved hydraulic performance

Corrosion-resistant coating that requires minimal maintenance

Patent US 11,319,679 B2, May 3, 2022

Before After

Old Morris Highway Emergency Replacement & Innovation Award

When a flood destroyed the multi-culvert structure on Old Morris Highway, Premier Steel Services stepped in with its rapid-install Fast Cast Bridge® system to restore critical access within the Muscogee Nation reservation. The solution, designed for swift deployment and long-term durability, enabled the swift reopening of this vital roadway. Premier Steel’s work on the Old Morris Highway Emergency Bridge Replacement earned the company the 2024 Innovative Bridge Project of the Year at the World Bridge Engineering Conference hosted by Florida International University and the Federal Highway Administration—recognizing its leadership in accelerated, cost-effective infrastructure solutions.

Want to learn more about these projects?

Why Choose Fast Cast Bridge® ?

The Fast Cast Bridge® embodies both Accelerated Bridge Construction (ABC) and an Innovative Project Delivery Method, setting a new standard for speed, safety, and efficiency in bridge replacement. By harnessing prefabricated structural systems and streamlined engineering, the Fast Cast Bridge significantly shortens project timelines and creates a more efficient path to completion.

For engineers, Fast Cast delivers ready-to-use structural design packages (MVPs, or Model View Packages)—saving days or even weeks of work. Asset owners benefit from these rapid proposals and structural designs, enabling bridge approvals and purchases to move forward while civil designs are still underway.

With over 35 successful installations, this ABC-based approach has proven its reliability: compressing timelines, lowering risk, and delivering durable, long-lasting infrastructure that restores vital connections quickly.

Innovative Project Delivery Method

Asset owner/Engineer contacts Premier Steel

Proposal and structural design delivered in 1–3 days

Bridge approved and purchased

Bridge ready for installation in 4–6 weeks post-approval

Premier Steel supports bidding, prep, and construction throughout the process

Applications

48b2ee2384143665c52db85d9e71ce915f930954

Span: Up to 60ft
Height: Up to 25ft
Road Width: Unlimited

0fe33ac29d759a5b9bea4649bbe9eece37716969

Municipal and county
roadway infrastructure

98bc7af0b378857f47f754ddd53749922162560a

Tribal and rural
community projects

5924d9eabaf5cfeef97fc407224afb109478e583

Flood-prone or environmentally sensitive areas

PS-5279_Website_DisasterRecovery_Icon

Post-Disaster Rapid Replacement

Ready to explore Fast Cast Bridge® for your next project?

Contact us today to discuss how it can reduce downtime, lower long-term costs, and deliver lasting performance.